Cross Border Planning and Infrastructure Measures for Flood Protection
Acronym |
FLOOD PROTECTION |
| Project Number – MIS | 5006157 |
| Priority axis | 2 - A Sustainable and Climate adaptable Cross-Border area |
| Investment priorities | 5b - Promoting investment to address specific risks, ensuring disaster resilience and developing disaster management systems |
| Intervention fields |
087. Adaptation to climate change measures and prevention and management of climate related risks e.g. erosion, fires, flooding, storms and drought, including awareness raising, civil protection and disaster management systems and infrastructures |
| Call | 3rd Call for Project Proposals |
| Lead Beneficiary | Region of Central Macedonia |
| Beneficiaries |
Decentralised Administration of Macedonia-Thrace District Administration of Blagoevgrad District Administration of Haskovo District Administration of Smolyan Region of Eastern Macedonia and Thrace Regional Administration of Kardzhali |
| Start Date | Sep 11, 2017 |
| End Date | Nov 30, 2023 |
| Budget | 12.543.170,63 € |
| ERDF Contribution | 10.661.695,04 € |
| National Contribution | 1.881.475,59 € |
| Website | http://www.crossborderfloodprotection.eu/ |
The main objective of the project is to increase the level of protection against floods in the c/b area of Greece and Bulgaria and especially in areas with high probability of flood events across the two international river basins of Struma/Strymon and Evros/Maritsa. In order to achieve this main objective, PBs have concluded on a number of sub-objectives which then were transformed into concrete actions. The sub-objectives of the project are:
• improvement/support/maintenance of existing permanent flood protection infrastructure in order to either increase their ability to constrain flood water or facilitate better water flow and therefore reduce the risk of flood
• supply of necessary equipment that will enable PBs to react promptly against imminent floods and constrain the negative effects of water in flood areas
• enhance the cooperation between competent authorities in the two countries and their capacity to address climate change
• supply of necessary equipment that will enable PBs to react promptly against imminent floods and constrain the negative effects of water in flood areas
• enhance the cooperation between competent authorities in the two countries and their capacity to address climate change
Downloads
VIDEOShttps://www.youtube.com/watch?v=QaaQT2St0m8
D.2.1.1_TVspot floodprotection (GR)
D.2.1.2_flood protection EN subs
flood protection animation
flood protection drone
PB6_Krumovitsa_Start_up
Flood Protection -Presentation of Project Results
D.2.1.3_Project Brochure_EN / GR / BG
D.2.2.1a_Flyer_Protective measures for the citizens in case of floods_GR
D.2.2.1b_Flyer_Protective measures for the citizens in case of floods_GR
D.2.4.3_Project Brochure_Blagoevgrad_EN / BG
D.3.1.2_Evaluation of the performance & interoperability of protection measures
LB_WP3_Integrated Infrastructure measures flood protection for River Struma & Kerkini Lake_EN
1. Strengthening Eastern Kerkini Lake dikes to protect local housing

2. Equipment for flood protection





.jpg)
3. Temporary Flood Defence System

4. Monitoring System of Kerkini Dikes

PB2_WP4_Integrated infrastructure measures flood Protection for River Evros_EN
1. Flood Protection measures in Orestiada

2. Flood Protection measures in Ferres, Alexandroupolis

3. Flood Protection measures in Soufli

4. Flood Protection measures in Didimotiho

5. Supply of wheeled pumping stations & military tents


PB4_WP3_Integrated infrastructure measures flood Protection for River Struma_EN
1. Restoration of threshold №2 of the Struma River and the right embankment at threshold №3 in the land of Blagoevgrad, Blagoevgrad municipality



2. Construction of protection facilities against floods on the river Struma & Construction of protective facilities from gabions to strengthen the left berm from the Struma riverbed

3. Construction of protective facilities against floods on the river Struma - a section of about 500 m in the village of Bulgarchevo, Blagoevgrad




PB5. Strengthening the right bank - construction of fortifications on the right bank of Maritsa River - and cleaning of the Maritsa River in the area of villages Velikan and Yabalkovo

PB6. WP 4_Integrated infrastructure measures flood Protection in Kardzhali:
- Restoration of the protective dike on Krumovitsa river near Oktan Petrol station
.jpg)
- Construction of a protective dike on Dzhebelska river, village of Tyutyunche/ Building a reinforcement wall on the left bank of Dzhebelska River





.jpg)
PB7 - Integrated infrastructure measures flood Protection for River Maritza/Evros/Ardas
Construction and upgrading of 3 security concrete walls along Cherna river in Smolyan, Varbitsa river in Zlatograd and Chepinska river in Rudozem. Construction of 2 concrete walls in Smolyan and Zlatograd
Rudozem
Smolyan
> BEFORE AFTER > .jpg)
> BEFORE AFTER > (1).jpg)
Zlatograd
> BEFORE AFTER > D.5.3.1_Impact Assessment Study_GR
D.5.4.1_Impact assessment report_flood protection measures in Blagoevgrad for Struma river_EN
D.5.5.1_Impact assessment report_flood protection measures in Haskovo for Maritsa River_BG
D.5.6.1_Impact assessment report_flood protection measures in Kardzhali_EN / BG
D.5.7.1_Impact assessment report_flood protection measures in Smolyan_BG (EN abstr)