Groundwater REsource managemENt for non-Potable water pUrposes, baseMent protection, and heating - Pilot application

Acronym

GREEN PUMP
Project Number – MIS 5027198
Priority axis 2 - A Sustainable and Climate adaptable Cross-Border area
Investment priorities 6f - Promoting innovative technologies to improve environmental protection and resource efficiency in the waste sector, water sector and with regard to soil, or to reduce air pollution
Intervention fields 021. Water management and drinking water conservation (including river basin management, water supply, specific climate change adaptation measures, district and consumer metering, charging systems and leak reduction)
Call 2nd Call for proposals under priority axes 2 & 4
Lead Beneficiary SPECIAL ACCOUNT FOR RESEARCH FUNDS - ARISTOTLE UNIVERSITY OF THESSALONIKI
Beneficiaries Municipality of Petrich
Municipality of Pilea-Hortiatis
REASEARCH ACCOUNT OF INTERNATIONAL UNIVERSITY OF GREECE
South-West University "Neofit Rilski", Faculty of Mathematics and Natural Sciences
Start Date Mar 15, 2018
End Date Nov 30, 2022
Budget 866.637,59 €
ERDF Contribution 736.641,95 €
National Contribution 129.995,64 €
Website http://greenpump.eu/
The project aims to optimize the exploitation of shallow aquifers, found in urban areas, first for secondary water uses, such as toilets and gardening, and then for heating purposes, while at the same time protecting basements of public buildings from flooding.  GREEN PUMP aspires to show a novel method that can be used to reduce unnecessary public works due to high network load, decrease the environmental impact of water/energy use in public buildings and, on the long run, save money. Our approach consists of the following:
1. Elaboration of criteria for site selection (groundwater quality, aquifer depth, vicinity to prospective users, flooding risk, etc.).
2. Study of technical implementation details to existing and new buildings and cost estimation.
3. Complete study of installations of several such systems in many areas of Greece.
4. Construction of one complete pilot installation in Thessaloniki, Greece, and secondary water use ones in Blagoevgrad and Petrich, Bulgaria, and Pylaia, Greece.
5. Elaboration of monitoring program for such systems and monitoring of the pilot systems.
6. Evaluation of the environmental and social benefits. Optimization of the design per user needs.
7. Policy document on the simplification of legal procedures.

 

Downloads

D.2.2.2_Project Leaflet_BG.EN
D.2.1.5_Overall public open report on the projects results.EN
D.6.7.1_Project Poster_2nd International Conference on Environmental Design_EN

D.3.1.2_3_4_5_Construction of pilot installations_EN
D.3.6.2_Construction pilot drilling well for non-drinking water_EN
D.3.6.3_Functionality test report of installation_EN
D.4.7.1.a_Pilot action_Serres_EN
D.4.7.1.b_Pilot action_Drama_EN
D.5.6.1_Monitoring of ground water quality at selected locations_EN

D.5.7.4_Evaluation of existing data & fixing of the measurement protocol_EN
D.5.5.2_Evaluation of the environmental and social benefits (Pilea Hortiatis GR)_EN
D.5.7.2_Evaluation of the environmental and social benefits (GR side)_EN

D.4.5.3_Policy report document on the simplification of permits required, and the elimination of bureaucratic barriers( GR side)_EN
D.4.6.5_Policy report document on the simplification of permits required, and the elimination of bureaucratic barriers (BG part)_EN

 

  Partner Search

Looking for potential beneficiaries to discuss starting a new project? Or you want to join an existing partnership? This is a good place to search for and establish contact with people who are interested in participating in your project.

  Programme Projects

Search the projects financed by the Programme!
 

  Search for project Beneficiaries!

If you already have a clear project idea but still need partners or if you want to join an existing partnership, then you are at the right place!

This is a good place to search for and establish contact with people who are interested in participating in a project.
top